News

- Aeroproject Will Examine Runway 2 Pavements in Domodedovo Airport

Aeroproject Will Examine Runway 2 Pavements in Domodedovo Airport

Specialists of FSUE “Aeroproject” have been carrying out regularly the monitoring of operational and technical conditions of Runway 2 in Domodedovo Airport since 2011. Through the monitoring the visual examination of artificial pavements are carried out to reveal types and volumes of typical defects, estimation of the actual bearing capacity of Runway 2 based on loading with the rated aircraft type, selecting and testing of core samples, ground penetrating radar investigation of the ground foundation, etc. are carried out.

According to results of the implemented investigations the current operation and technical condition of the pavements and defect formation dynamics are estimated, types and volumes of repair works are determined to keep the pavements usable, and also several strategies of repair works are offered.

It is planned to continue to monitor Runway 2 pavements and in 2015-2016. FSUE “Aeroproject” wan the open tender for the investigation of operation and technical condition of Runway 2 artificial pavements in Domodedovo Airport.


Back to the list